Terminal 5 Heathrow Airport


The Terminal 5 Project has three main areas of work for Hotchkiss.

The first is the 87m high Control Tower where the main cab was pre-assembled in a separate part of the airport, then transported to its final position and jacked up to its full height. Secondly, Building B is the link between the main terminal and the aircraft. Thirdly, Building A (pictured) is the main terminal building.

Hotchkiss has worked as part of the integrated 1st Tier team from the early days developing the design, assisting with the procurement of plant and delivering and installing the air systems, including all fire resistant duct systems, thermal insulation, commissioning and procurement of all in-duct equipment and fire duct.

Hotchkiss Ltd has also worked on the Energy Centre, TTS (Trans Track System), RTS (Rail Track & Stations) and multi storey car park 5.

Interesting Facts:-

  • T5 will cost £4.2 billion to build

  • T5 gives the capacity for an additional 30 million passengers per year

  • More than 60,000 workers will have been involved buiding the project

  • T5 will have 18km of baggage systems which will handle 14,000 bags per hour

  • The total ductwork metreage on all the projects is in excess of 70km



Developer:BAA plc
Architect:Richard Rogers & Partners
Cost Consultants:Turner & Townsend and E C Harris
Programme:August 2002 to March 2007